Air-conditioning system of the SEDA 2 industrial plant
Air-condition system of the SEDA 2 industrial plant (about 32,000 cubic metres) We carried out the executive-constructive design and building of the new air-conditioning system of the SEDA 2 industrial plant in Arzano (NA): about 32,000 cubic meters. The construction activities were carried out without interrupting the production activity. The system uses all the heat…